July 3, 2007

The Crane Returns !

The crane returned again on Monday, July 2nd to continue
the noise reduction work on the air conditioning units.


Library Staff had to remain in the parking lot until all
work with the crane was completed.


Youth Services Librarians, Miss Dana and Miss Carol hold an
informal meeting while waiting for the okay to enter the Library.

June 13, 2007

Main Level Almost Completed !

Book Club Kits and Audio Book Collection are now
in their permanent places on the Main Level.


The parlor area is one of the few places left that
have been scheduled for paint touch-ups.


Music CDs have also been moved to their new location, just outside
the new Teen Zone area.

June 6, 2007

Moving materials on the Main Level

The books on tape and on CD have been moved
to their new location, so this is now ready to re-carpet.


Yes, they do have a handy gadget to move shelves with
books still on them !


The fiction shelves get moved to their temporary location.

May 19, 2007

Main Level renovation continues

Clerks and other support staff members have been
temporarily moved to the new Teen Zone while their
work area is being renovated.


New carpeting is being installed throughout the
Main Level.


Cathy, the Young Adult Services Librarian, works from the
temporary Reader's Advisory Desk in front of the Large Print Books.

May 11, 2007

New Carpeting for Main Level of the Library

The barrier has been removed from the Main Level Teen Zone.
Carpeting tiles are in the process of being glued in place.


The blues and purples in the carpeting match the colors
of the walls in the new Teen Zone. Study room is lime green.


Patrons are still able to browse through all materials on the Main
Level despite the carpeting project.

May 7, 2007

Changes at the Circulation Desk

Jane, our Support Staff Coordinator, poses next to the
many carts of materials on reserve for our patrons. This is
a temporary solution while construction is taking place.


Windows now take the place of the shelves behind the
Circulation Desk where the reserves used to be kept.

April 26, 2007

New paint colors from the Teen Zone area.

This is inside the Teen Zone area looking outward toward the
main area of the Library.


Wooden column with metal detail work is at the entrance
to the Teen Zone.


Group Study Room in the Teen Zone area is taking shape.