August 31, 2006

New photos of the construction progress on the third floor.

This is a view of the future copier room, looking toward
the east dormer.


The stairway is now complete from the third floor
down to the lower level.


Overall view of the third floor from the far corner of the room.

August 22, 2006

Siding almost finished on Library Dormers

The siding is complete on the north side dormer.


Siding is almost complete on the east dormer,
on the entrance side of the Library.

August 17, 2006

Doors & windows removed from study rooms

Doors and windows were removed from the Quiet Study
Room downstairs on Wednesday, Aug. 16th.


The doors and windows were also removed from the
two
Group Study Rooms.


Until they are ready to be installed on the third level, these items are safely kept in our storage area along with the Youth Room painting.

August 2, 2006

Staircase Progress

The stairs connecting the main floor with the upper level are
taking shape quickly.

It's an awesome look upward to the third floor
from inside the "big wooden box."

August 1, 2006

Windows and siding arrive for dormer!

The siding is going up and the windows are going in
on the dormer facing the parking lot.

Drywall for the third floor is first lifted into the air with the crane.
Then it is carefully moved into the building through the hole
in the unfinished dormer on the north side of the Library.