October 31, 2006

Downstairs construction progresses!

Former location of adult non-fiction shelves, facing the
north side of the Library. The dust in the air causes everything
to look blurry and out of focus.


The group study rooms are now gone. The blue painted area
is where the youth biographies were shelved along the wall.


Patrons would have been looking at the Reference Desk area
several weeks ago. Now it's just hanging wires to mark the spot.

October 23, 2006

Oh Where, Oh Where are the Internet Computers?

All public Internet and Word Processing Computers
have been removed from the Lower Level.


They will soon find their new home on the Upper Level !

October 22, 2006

Youth Non-Fiction now on Main Level.

Youth non-fiction materials are now on the Main Level.
You can't miss all of the shelves!


Youth magazines and videos are shelved close to
the stairway for convenient browsing.

October 21, 2006

Upper Level is Looking Good!

Special Collections such as ESL, Job Search, Test
Tutors, Language A/V and Genealogy are on these shelves.


Reference Products have a new home on the Upper Level.


These two-person rooms on the Upper Level will be
wonderful for tutoring sessions.

October 19, 2006

The Lower Level is now empty!

Computer Lab is being dismantled prior to the move to
the Upper Level.


The Lower Level looks pretty deserted after the books
and magazines were removed.


The Genealogy Computers and Reference Products
computers are also in the moving process.

October 10, 2006

The Books Start to Move !

Adult biographies are removed from the shelves and loaded on carts
for the trip to the third floor.


Movers line up the carts as they finish filling them.


Carts are then shrink-wrapped to avoid spilling the books and are
ready to be moved upstairs.

Third floor ready for the move.

Carpeting details are being completed on the third level.
This is the future site of the Reference Desk.


The first shelves are being installed on the walls in preparation
for the books arriving from the lower level.


View at the top of the stairway to the third floor. The
public restrooms are on the left wall.

October 9, 2006

The Move Starts !!

The new stairway is ready, except for carpet on the steps.


All of the back issues of magazines have been removed from the
shelves on the lower level.


These older magazines are now stored under the slanted shelves
that display the current issues of periodicals on the main level.