July 3, 2007

The Crane Returns !

The crane returned again on Monday, July 2nd to continue
the noise reduction work on the air conditioning units.


Library Staff had to remain in the parking lot until all
work with the crane was completed.


Youth Services Librarians, Miss Dana and Miss Carol hold an
informal meeting while waiting for the okay to enter the Library.

June 13, 2007

Main Level Almost Completed !

Book Club Kits and Audio Book Collection are now
in their permanent places on the Main Level.


The parlor area is one of the few places left that
have been scheduled for paint touch-ups.


Music CDs have also been moved to their new location, just outside
the new Teen Zone area.

June 6, 2007

Moving materials on the Main Level

The books on tape and on CD have been moved
to their new location, so this is now ready to re-carpet.


Yes, they do have a handy gadget to move shelves with
books still on them !


The fiction shelves get moved to their temporary location.

May 19, 2007

Main Level renovation continues

Clerks and other support staff members have been
temporarily moved to the new Teen Zone while their
work area is being renovated.


New carpeting is being installed throughout the
Main Level.


Cathy, the Young Adult Services Librarian, works from the
temporary Reader's Advisory Desk in front of the Large Print Books.

May 11, 2007

New Carpeting for Main Level of the Library

The barrier has been removed from the Main Level Teen Zone.
Carpeting tiles are in the process of being glued in place.


The blues and purples in the carpeting match the colors
of the walls in the new Teen Zone. Study room is lime green.


Patrons are still able to browse through all materials on the Main
Level despite the carpeting project.

May 7, 2007

Changes at the Circulation Desk

Jane, our Support Staff Coordinator, poses next to the
many carts of materials on reserve for our patrons. This is
a temporary solution while construction is taking place.


Windows now take the place of the shelves behind the
Circulation Desk where the reserves used to be kept.

April 26, 2007

New paint colors from the Teen Zone area.

This is inside the Teen Zone area looking outward toward the
main area of the Library.


Wooden column with metal detail work is at the entrance
to the Teen Zone.


Group Study Room in the Teen Zone area is taking shape.

April 9, 2007

Teen Zone Construction Updates

Teen Zone walls are in place. Windows are on the Main St. side.


The staff area windows can be see just outside of
the Teen Zone walls


This is a view from the Teen Zone looking toward the
new coffee kiosk area.

March 24, 2007

New Furniture for Children's Area

New furniture has arrived for the Lower Level Youth Area.


Father and daughter spend time together with a puzzle
by the puppet theater.


Children's game computers all all set up next to the
media kits.

March 21, 2007

Progress in the new Teen Zone area

The new Teen Zone study room is in the far corner.


This alcove may be destined to become a
vending machine area just outside the Teen Zone.


Large open windows will set the Teen Zone area apart from the
CD Book shelves. You can see the frames here.

March 5, 2007

Work continues on Lower Level.

The Youth Games Gazebo is taking shape!


The fish are comfortable in their new home on the Lower Level.


Display furniture is going up in the portal area.

Work starts on new Teen Zone area

Work on the new Teen Zone area has begun on the Main Level.


Inside the construction area, tools and materials are stacked up.

February 21, 2007

Moving Day for the Youth Services Department.

Miss Carol starts unpacking the Youth Reference books.


Youth Reference desk awaits computers and Librarians.


The Storybook house is up. The shelves will be filled with
Easy Readers for those just learning to read.

January 27, 2007

Carpeting now installed in Lower Level

Carpeting is now laid through the Youth Area Portal


Looking straight ahead, you can see the entrance to the computer
storage room, the Friends' Storage Room, and the elevator.


Carpeting is being put down in the Youth Games Area

January 3, 2007

More painting in the Lower Level

This will be the children's restroom in the Youth Area.


Lighting is being installed in the Storytime Room
and the cabinets are looking good.


Close-up of the colors at the portal to the Youth Area.

December 30, 2006

The Very Colorful Children's Area

Workers check out the color combination in the
arches in the Children's Area.


The Storytime Room has wonderful stripes to go
with the purple sink.

December 6, 2006

Painting continues on Lower Level.

The different wall colors can be seen despite
the various construction tools.


The area for Youth Magazines is a great
shade of lavender!


Wow! There is a purple counter-top in the
Storytelling Room.

December 2, 2006

Lower Level Progress

Enter the new Childrens Floor through this set of arches.
The Storytelling Room is taking shape in the Lower Level where the
Youth Nonfiction and Biographies used to be.

The walls have been painted in sherbert colors of green, blue, and
the strawberry hue you see in this photo.

November 9, 2006

More Upper Level Photographs

Large group study room will easily accomodate at least six
people. WiFi access will be available in study rooms as well as
electrical outlets for laptop computers.


Windows brighten the new Reference Area. The Youth Reference
books are now housed with the rest of the children's non-fiction
materials on the Main level.


The Travel books, videos, and DVDs have their very own area
on the upper level, with chairs available for browsing time.

November 8, 2006

Upper Level Photos

Computers with the online catalog are conveniently located at the
top of the stairs.


The staff desk on the upper level is used by both Librarians for
reference help and Library Pages to help with computers.


Public Internet computers and word processing computers are up
and running. The print release station is in view at the end of
the row of computers. All print jobs are picked up here.

November 1, 2006

Downstairs construction, week #2

The Internet computers were in this area, with the youth
non-fiction in rows behind them. Workers are removing
the old carpeting from this area.


This roughed-in room will become the Friend's space in the lower
storage area. This is the sorting spot for donated books prior to
book sales.

October 31, 2006

Downstairs construction progresses!

Former location of adult non-fiction shelves, facing the
north side of the Library. The dust in the air causes everything
to look blurry and out of focus.


The group study rooms are now gone. The blue painted area
is where the youth biographies were shelved along the wall.


Patrons would have been looking at the Reference Desk area
several weeks ago. Now it's just hanging wires to mark the spot.

October 23, 2006

Oh Where, Oh Where are the Internet Computers?

All public Internet and Word Processing Computers
have been removed from the Lower Level.


They will soon find their new home on the Upper Level !

October 22, 2006

Youth Non-Fiction now on Main Level.

Youth non-fiction materials are now on the Main Level.
You can't miss all of the shelves!


Youth magazines and videos are shelved close to
the stairway for convenient browsing.

October 21, 2006

Upper Level is Looking Good!

Special Collections such as ESL, Job Search, Test
Tutors, Language A/V and Genealogy are on these shelves.


Reference Products have a new home on the Upper Level.


These two-person rooms on the Upper Level will be
wonderful for tutoring sessions.

October 19, 2006

The Lower Level is now empty!

Computer Lab is being dismantled prior to the move to
the Upper Level.


The Lower Level looks pretty deserted after the books
and magazines were removed.


The Genealogy Computers and Reference Products
computers are also in the moving process.

October 10, 2006

The Books Start to Move !

Adult biographies are removed from the shelves and loaded on carts
for the trip to the third floor.


Movers line up the carts as they finish filling them.


Carts are then shrink-wrapped to avoid spilling the books and are
ready to be moved upstairs.

Third floor ready for the move.

Carpeting details are being completed on the third level.
This is the future site of the Reference Desk.


The first shelves are being installed on the walls in preparation
for the books arriving from the lower level.


View at the top of the stairway to the third floor. The
public restrooms are on the left wall.

October 9, 2006

The Move Starts !!

The new stairway is ready, except for carpet on the steps.


All of the back issues of magazines have been removed from the
shelves on the lower level.


These older magazines are now stored under the slanted shelves
that display the current issues of periodicals on the main level.

September 26, 2006

New Carpeting for Third Floor

Carpet squares arrive upstairs ready for installation.


Workers lay carpet squares on the third floor in preparation for
the move in mid-October.

The wooden box comes down and stairs go up!

Just before the unveiling of the staircase, construction workers
put on the finishing touches underneath the plastic sheeting.

First look at the new stairs to the third floor. These will not be open
until the move takes place in mid October.


View of the detail work on the new stairs directly behind the public
catalog computers on the Main Level.

September 21, 2006

Finishing the new dormers

Peering through the leaves, you can view a painter putting the
finishing touches on one of the new dormers.

September 18, 2006

Recycling Lights

Anyone visiting the Lower Level of the Library for the next month will note rows of lights missing and strings of temporary lanterns in their place. We're borrowing about 100 fluorescent fixtures for the Upper Level instead of buying all new fixtures. Since the renovated Lower Level will use fewer of these fixtures, this trade helps maximize our re-use and minimize our new purchase of light fixtures. Pat T.











September 5, 2006

Doors and windows going in on third floor.

Corner quiet study on third floor. For those who miss the
doors & windows from the lower level - here they are!


The computer lab is taking shape on the third floor making use
of more windows and doors from the lower level.

August 31, 2006

New photos of the construction progress on the third floor.

This is a view of the future copier room, looking toward
the east dormer.


The stairway is now complete from the third floor
down to the lower level.


Overall view of the third floor from the far corner of the room.

August 22, 2006

Siding almost finished on Library Dormers

The siding is complete on the north side dormer.


Siding is almost complete on the east dormer,
on the entrance side of the Library.

August 17, 2006

Doors & windows removed from study rooms

Doors and windows were removed from the Quiet Study
Room downstairs on Wednesday, Aug. 16th.


The doors and windows were also removed from the
two
Group Study Rooms.


Until they are ready to be installed on the third level, these items are safely kept in our storage area along with the Youth Room painting.

August 2, 2006

Staircase Progress

The stairs connecting the main floor with the upper level are
taking shape quickly.

It's an awesome look upward to the third floor
from inside the "big wooden box."

August 1, 2006

Windows and siding arrive for dormer!

The siding is going up and the windows are going in
on the dormer facing the parking lot.

Drywall for the third floor is first lifted into the air with the crane.
Then it is carefully moved into the building through the hole
in the unfinished dormer on the north side of the Library.

July 27, 2006

Staircase to third floor looking good!

Looking upward toward the third floor, you can see the ductwork in place and view the progress being made on the stairs.

Inside the large wooden box on the main level of the Library, workers are putting in the framework for the staircase to the third floor.

July 21, 2006

Third floor starting to take shape.

Third floor showing view of the structure going up for a group study room. There will be two-person study rooms as well as group study rooms on this level.

Here you can see the opening for the stairs to go down to the main level. The framework for the restrooms can be seen in the background.

July 12, 2006

What a View !

Here is a view from the third floor looking down through the hole in the floor and into the main stairwell. This is the reason for the large wooden "box" in the Library !

July 6, 2006

More photos of the upper level

View of the upper level shows the cement cut for the stairway
opening to go down to the main level.

Here is an inside view of the dormer covered with the blue tarp.
It gives everything around the opening a light blue haze.

July 5, 2006

The Big Wooden Box in the Library

The stairway from the main level to the lower level has been
encased in a large wooden box while the new stairway is being
cut from the upper level to the main floor.
Here is the view from inside the box looking
up from the lower level - stairs looking beautiful
with their own lighting installed on the walls.

June 28, 2006

First look at the 3rd Floor interior

We can all see the progress on the exterior, but here's a
glimpse of what the interior of the third floor looks like.
Have you wondered what all of that blue plastic is covering -
well, now you can see it from the inside!

June 20, 2006

Work on dormers continues.

The dormer on the entrance side of the building takes shape
as workmen take advantage of the good weather.
The dormer on the north side of the building is the largest one,
which will provide plenty of natural lighting for the third floor.

June 9, 2006

The big crane and more steel beams arrive !

Construction continues on the large dormer on the entrance
side of the Library.
It was quite a sight as the tall crane dominated the skyline while
moving the beams in place for the dormer construction.

June 6, 2006

Good weather for outdoor work on the Library

>



The crane is in place to start lifting beams to Library's third floor.
Dormer construction starts on the roof above the Library entrance.

June 5, 2006

Dormer Construction Started

Construction has started on the first of several dormers to be added
to the third floor.